Project Description:

The project will grind out about 3.5 inches of deteriorated pavement and will install fresh hot mixed asphalt on the section of S 212th Way between the east end of the SR 167 overpass bridge to 96th Way. The project will also repair existing but buckled and damaged cement concrete sidewalks and curb and gutter.

How long will this project take?

July 2017 - Bid Opening
August to November 2017 - Major construction
Currently working on finalizing channelization markings and minor pavement repairs to complete the project.

Project Award:

$1,139,919.50

Project Engineer:

Joseph S. Araucto, P.E.
253-856-5664

Contractor:

Tucci & Sons, Inc.

Construction Inspector:

To be determined